Bespoke Paving
Patio Paving work carried out by Bespoke Paving

Patios and paving

Patio Paving

New patios, paths, steps and retaining walls, plus cleaning and restoration of existing paving.

  • Free written quotes
  • Fixed price, not an estimate
  • Worksop and across the county

Get a price for patio paving

Friendly advice, no obligation. We will come out and measure up.

A patio has to do three things: sit level and stable, shed water away from the house, and stay clean enough to use. Most of the failed patios we lift did none of them, because they were laid on five dabs of mortar instead of a full bed.

We lay every slab on a full mortar bed over a compacted base. Full bedding matters more than anything else on a patio, because a slab supported only at its corners rocks, cracks across the middle, and lets water sit underneath it. It is the single most common reason a patio fails early.

We also set the falls properly. A patio wants a gentle fall away from the house, and it must sit at least 150mm below the damp proof course, or you have built a route for water into the brickwork. If your levels do not allow that, we will tell you at the quote stage and design in a drainage channel rather than quietly bridging the damp course.

Patio Paving carried out by Bespoke Paving

What’s included

What you get for the price

Every slab is priced on a full mortar bed, not spot bedded on five dabs. That is the single most common reason patios fail early, and it is not where we save money.

  • Excavation and a compacted stone sub-base to suit the paving
  • Every slab laid on a full mortar bed, not spot bedded
  • Falls set away from the house, and levels kept clear of the damp proof course
  • Cuts made on site around returns, steps and planting
  • Joints pointed with a brush-in compound or hand pointed as the paving needs

What affects the price

Why we quote per job

There is no useful price per square metre for this, because these change the number more than the material does:

  • Area, and how many cuts the shape needs
  • The paving itself, since porcelain, natural stone and concrete are very different prices
  • Whether the ground has to be dug out and carted away or built up
  • Access, because slabs and muck barrowed a long way take longer
  • Steps, walls or drainage channels that form part of the same job

We check your levels against the damp course at the quote stage. Where they are tight, a drainage channel goes into the price rather than appearing as an extra later.

How it works

Patio Paving, step by step

  1. 01

    Site visit and design

    We measure up, look at your levels against the damp course, and talk through paving, size and shape.

  2. 02

    Written quotation

    A fixed price naming the paving, the base construction and the pointing method.

  3. 03

    Excavate and base

    Dig out, cart away, then lay and compact the stone base.

  4. 04

    Lay on full beds

    Slabs laid on a full mortar bed, set to line and to fall, with cuts made as we go.

  5. 05

    Point and clean off

    Joints pointed, the surface washed down, and the site left clear.

Why us

Why people pick us for this

The base is specified

Our written quote names the sub-base depth and the materials, so you can see what is going under the surface and compare quotes on the same terms.

A fixed price

The written price is what you pay. If something genuinely unforeseen turns up once we open the ground, we stop and talk to you before doing anything about it.

You deal with the person doing the work

No sales visit followed by a different crew. The person who quotes the job is on site doing it.

Straight advice

If the job you have asked for is not the right answer, or a clean would do instead of a replacement, we will tell you before you spend the money.

Patio Paving across Nottinghamshire

We are based in Worksop and cover the towns below, plus the villages around them.

  • Worksop
  • Mansfield
  • Chesterfield
  • Newark on Trent
  • Nottingham
  • Lincoln
  • Derby
  • Grantham

Common questions

Patio Paving questions

How close to the house can a patio be?

It has to finish at least 150mm below the damp proof course, which is usually two brick courses. Where the existing levels make that awkward we design in a drainage channel against the wall rather than bridging the damp course.

Why do slabs come loose?

Nearly always spot bedding, where the slab is laid on five dabs of mortar. It is quicker to lay, and it rocks, cracks and lets water sit underneath. We lay every slab on a full bed.

Which paving is easiest to look after?

Porcelain. It absorbs almost nothing, so it does not stain readily and it goes green far more slowly than natural stone or concrete. It costs more to buy and takes longer to cut.

Checked and supplied

Vetted on Checkatrade, laid with brands you know

  • Marshalls
  • Brett
  • Natural Paving
  • Tarmac
  • Hanson
  • Cemex
  • Aggregate Industries

See our Checkatrade profile

Want a price for patio paving?

We will come out, measure up and put a fixed price in writing. No charge for the visit.

Call nowGet a quote